Equipment replacement
Equipment coordination
The key comparison was the complete supported assembly, with equipment type, electrical compatibility, and installation arrangement considered alongside weight.
Read the lead dossier →Plumbing coordination
Progress documentation
A proposed roof layout became a connected, editable drainage study while equipment locations, outlet elevations, and available gravity fall remained explicit verification items.
Read the dossier →Design review
Review and revision planning
A deliberately incomplete review issue became a record of answered questions, project-specific direction, and clearly identified revision work.
Read the dossier →